Yellow, Inc. manufactures teddy bears and dolls. Currently, Yellow makes 2,000 teddy bears each month. Each teddy bear uses $2.00 in direct materials and $0.50 in direct labor. Yallow uses two activities in manufacturing the teddy bears: Sewing and Processing. The cost associated with Sewing is $15,000 a month, allocated on the basis of direct labor hours. The cost associated with Processing is $10,000 a month, allocated on the basis of batches. The activity drivers are used as follows:

Teddy Bears Dolls
Direct labor hours 200 200
Batches 35 65

Required:
What is the total manufacturing cost for one teddy bear?